导读:article 5 guarantee5.1part b guarantees that the documentation supplied shall be of the latest technological achievement within the valid period of the contract and shall be exactly identical with the documentation currently used by part b.5.2part b guarantees that the documentation supplied shall be complete, correct and legible.article 6 tax and duty6.1all taxes, customs and other duties in connection with the performance of the contract arising outside
转让技术秘密和补偿贸易合作生产协议,标签:技术开发合同,技术咨询合同,http://www.qz26.com
article 5 guarantee
5.1part b guarantees that the documentation supplied shall be of the latest technological achievement within the valid period of the contract and shall be exactly identical with the documentation currently used by part b.
5.2part b guarantees that the documentation supplied shall be complete, correct and legible.
article 6 tax and duty
6.1all taxes, customs and other duties in connection with the performance of the contract arising outside the part a side shall be borne by part b.
6.2all taxes, customs and other duties in connection with the performance of the contract arising inside the part a side shall be borne by part a.
article 7 trademark
7.1part a shall have the right to use the part b trademark and serial number of contracted products. part a shall label the trademark smith - portla co, ltd. on the contracted products so produced.
7.2nameplates, quotations, technical specifications, advertisement, instruction manuals, samples of the contracted products manufactured by part a shall all be labelled with the name of part a.
article 8 packing
8.1packing shall be in the form of strong wooden case (s) suitable for long voyage and well protected against dampness, moisture, shock, rust and rough handling. the seller shall be liable for any damage to the goods and extra expenses due to improper packing, inadequate or improper protective measures.
8.2the package number, measurements, gross weight, net weight, the words "keep away from moisture"and the following shipping marks shall be printed with fadeless paint on each package:
(1)part b/part a 12v - 400zc
(2)part b/part a12v- 600zc
8.3packing list in duplicate indicating gross and net weight,measurements and quantity of each item is included.
article 9 force majeure
9.1should either party of the contract be prevented from implementing the contract by such cases of force majeure as war, serious fire, flood, typhoon and earthquake, or other events confirmed by both parties, the time for implementing the contract shall be extended by a period equal to the effect of such force majeure.
9.2the party concerned shall notify the other party by cable within the shortest possible time after occurrence of the force majeure and send by registered airmail within 14 (fourteen) days to the other party a certificate issued by relevant authorities for confirmation.
9.3should the effects of force majeure continue for more than 120 (one hundred twenty) consecutive days, both parties shall settle further execution of the contract through friendly negotiations as soon as possible.
article10 arbitration
10.1all disputes relating to the contractor arising from the execution of the contract shall be setfled through friendly consultations between both parties. should no settlemnt be reached, the disputes shall be submitted to arbitration.
10.2the arbitration shall take place in stockholm, sweden, and be conducted by the arbitration institute of the stockholm chamber of commerce.
10.3the arbitration award shall be final and binding on both parties.
10.4the arbitration fee shall be borne by the losing party except otherwise awarded by the arbitration institute.
10.5in the course of arbi. tration, the contract shall continuously be executed by both parties except for the part which is under arbitration.
article 11 effectivenessof the contract and miscellaneous
article 5 guarantee
5.1part b guarantees that the documentation supplied shall be of the latest technological achievement within the valid period of the contract and shall be exactly identical with the documentation currently used by part b.
5.2part b guarantees that the documentation supplied shall be complete, correct and legible.
article 6 tax and duty
6.1all taxes, customs and other duties in connection with the performance of the contract arising outside the part a side shall be borne by part b.
6.2all taxes, customs and other duties in connection with the performance of the contract arising inside the part a side shall be borne by part a.
article 7 trademark
7.1part a shall have the right to use the part b trademark and serial number of contracted products. part a shall label the trademark smith - portla co, ltd. on the contracted products so produced.
7.2nameplates, quotations, technical specifications, advertisement, instruction manuals, samples of the contracted products manufactured by part a shall all be labelled with the name of part a.
article 8 packing
8.1packing shall be in the form of strong wooden case (s) suitable for long voyage and well protected against dampness, moisture, shock, rust and rough handling. the seller shall be liable for any damage to the goods and extra expenses due to improper packing, inadequate or improper protective measures.
8.2the package number, measurements, gross weight, net weight, the words "keep away from moisture"and the following shipping marks shall be printed with fadeless paint on each package:
(1)part b/part a 12v - 400zc
(2)part b/part a12v- 600zc
8.3packing list in duplicate indicating gross and net weight,measurements and quantity of each item is included.
article 9 force majeure
9.1should either party of the contract be prevented from implementing the contract by such cases of force majeure as war, serious fire, flood, typhoon and earthquake, or other events confirmed by both parties, the time for implementing the contract shall be extended by a period equal to the effect of such force majeure.
9.2the party concerned shall notify the other party by cable within the shortest possible time after occurrence of the force majeure and send by registered airmail within 14 (fourteen) days to the other party a certificate issued by relevant authorities for confirmation.
9.3should the effects of force majeure continue for more than 120 (one hundred twenty) consecutive days, both parties shall settle further execution of the contract through friendly negotiations as soon as possible.
article10 arbitration
10.1all disputes relating to the contractor arising from the execution of the contract shall be setfled through friendly consultations between both parties. should no settlemnt be reached, the disputes shall be submitted to arbitration.
10.2the arbitration shall take place in stockholm, sweden, and be conducted by the arbitration institute of the stockholm chamber of commerce.
10.3the arbitration award shall be final and binding on both parties.
10.4the arbitration fee shall be borne by the losing party except otherwise awarded by the arbitration institute.
10.5in the course of arbi. tration, the contract shall continuously be executed by both parties except for the part which is under arbitration.
article 11 effectivenessof the contract and miscellaneous