工业工程师英文简历
12-15 15:02:04
来源:http://www.qz26.com 英文求职信写作 阅读:8124次
导读:INDUSTRIAL ENGINEER Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.PROFESSIONAL EXPERIENCE1985-Present LEYNER CORPORATION,Lake Charles,LAIndustrial EngineerProvide floor support engineering in printed wire assembly (PWA) and subsystem assembly (SSA) areas. Purchase capital equipment.Interface with vendors. Justify expenditures. Design plant layout fixtures,and flow charts of material. Program automatic equipment. Write process sheets and rework proc
工业工程师英文简历,标签:英文求职信写作,求职信模板,http://www.qz26.com
Industrial EngineerProvide floor support engineering in printed wire assembly (PWA) and subsystem assembly (SSA) areas.
Purchase capital equipment.Interface with vendors. Justify expenditures.
Design plant layout fixtures,and flow charts of material.
Program automatic equipment.
Write process sheets and rework procedures.
Recommend changes to product to allow ease of manufacture.
Implement design changes.Inititate methods and process improvements.
Troubleshoot problems.Effect disposition or rejection of material.
Provide assistance to all other departments.
1984 PRUDENCE D. MCHARRISON LABORATORY,Ruston,LA
Engineering AssistantConducted variety of tests including Tensile.Compression,and creep tests on molded parts.
Responsible for production of plastic test specimens,and mounting polishing,and microscopic analysis.
Designed tools and fixtures for Instron machine.
1982/83 DUCHESS COMPONENTS,Baton Rouge,LA
Molding Room Attendant,1983Operated and maintained machine producing epoxy preforms.
Maintained records on inventory,loss of material,and quality control. www.qz26.com
Machine shop attendant,1982Operated lathes,milling and grinding machines;monitored welding and heat treatments.(责任编辑:www.qz26.com)
INDUSTRIAL ENGINEER
Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.
Industrial EngineerProvide floor support engineering in printed wire assembly (PWA) and subsystem assembly (SSA) areas.
Purchase capital equipment.Interface with vendors. Justify expenditures.
Design plant layout fixtures,and flow charts of material.
Program automatic equipment.
Write process sheets and rework procedures.
Recommend changes to product to allow ease of manufacture.
Implement design changes.Inititate methods and process improvements.
Troubleshoot problems.Effect disposition or rejection of material.
Provide assistance to all other departments.
1984 PRUDENCE D. MCHARRISON LABORATORY,Ruston,LA
Engineering AssistantConducted variety of tests including Tensile.Compression,and creep tests on molded parts.
Responsible for production of plastic test specimens,and mounting polishing,and microscopic analysis.
Designed tools and fixtures for Instron machine.
1982/83 DUCHESS COMPONENTS,Baton Rouge,LA
Molding Room Attendant,1983Operated and maintained machine producing epoxy preforms.
Maintained records on inventory,loss of material,and quality control. www.qz26.com
Machine shop attendant,1982Operated lathes,milling and grinding machines;monitored welding and heat treatments.(责任编辑:www.qz26.com)
Tag:英文求职信写作,英文求职信写作,求职信模板,求职自荐 - 英文求职信写作
下一条:培训协调员英文简历