导读:8.2equipment and spare partsthe supplier agrees to procure, inspect and expedite the equipment fordelivery fob vessels at ports of shipment (or cif ocean ports ofdestination)in accordance with the terms of article 22.2 (delivery)hereof.within the contract price for the equipment specified in article 12(contract price and technical service fee)hereof, the supplier agrees tosupply as a part of the equipment those spare parts as required for theerection, inst
国际技术转让加设备进口合同,标签:技术开发合同,技术咨询合同,http://www.qz26.com
8.2equipment and spare parts
the supplier agrees to procure, inspect and expedite the equipment fordelivery fob vessels at ports of shipment (or cif ocean ports ofdestination)in accordance with the terms of article 22.2 (delivery)hereof.
within the contract price for the equipment specified in article 12(contract price and technical service fee)hereof, the supplier agrees tosupply as a part of the equipment those spare parts as required for theerection, installation and the commissioning of the equipment up to theacceptance as per the list of the spare parts specified in appendix 7-1(scope of works and supply)hereto. the supplier shall procure, inspect,expedite and deliver these spare parts in the same manner as specified for the equipment in accordance with the terms of the contract.
8.3spare parts for operation
in addition to the stipulations in article 8.2 (equipment and spareparts)above, the supplier also agrees to supply spare parts required forthe operation and maintenance of the equipment for the period specified inappendix 7-1 (scope of works and supply)hereto. however, the buyer shallpay to the supplier the price of such spare parts, including other costsand expenses relating to the supply of the same, in addition to thecontract price for the equipment specified in article 12.1.1 hereof. suchprice and other terms and conditions for the supply of such spare partsshall be separately agreed in writing between the buyer and the supplierwhen the identity, specifications and quantities of the said spare partshave been determined between the buyer and the supplier.
8.4technical documents
the supplier agrees to prepare and submit to the buyer the technicaldocuments as per the list of the technical documents as specified inappendix 7-1 (scope of works and supply)hereto in accordance with theterms of the contract.
8.5technical services
the supplier agrees to provide the technical services at the contractplant as specified in appendix 7-5 (the supplier's engineer's technicalservices and working conditions)hereto in accordance with the terms ofthe contract.
8.6training
the supplier shall be responsible for conducting the training of thebuyer's operating and maintenance personnel as specified in appendix 7-1(scope of works and supply)hereto. the maximum number of man-months,places and periods of training and the responsibility for associated costsand expenses are as specified in appendix 7-1 (scope of works and supply)hereto. all other conditions including the program for and nature of thetraining shall be agreed between the buyer and the supplier.
article 9.supplier's manner of execution of works
9.1the supplier shall execute and complete the works with due careand diligence in accordance with the contract.
9.2the supplier shall comply with all laws in force in the countrywhere the works are carried out, whether national, provincial, municipalor otherwise, affecting the performance of the contract and binding uponthe supplier. the supplier shall indemnify and hold harmless the buyerfrom and against any and all liabilities, damages, claims, fines,penalties and expenses of whatever nature arising out of or resulting fromthe violation of such laws by the supplier or its personnel, including thesub-contractors and their personnel but without prejudice to article 10. 1(information and data)below.
article 10.buyer's responsibilities
8.2equipment and spare parts
the supplier agrees to procure, inspect and expedite the equipment fordelivery fob vessels at ports of shipment (or cif ocean ports ofdestination)in accordance with the terms of article 22.2 (delivery)hereof.
within the contract price for the equipment specified in article 12(contract price and technical service fee)hereof, the supplier agrees tosupply as a part of the equipment those spare parts as required for theerection, installation and the commissioning of the equipment up to theacceptance as per the list of the spare parts specified in appendix 7-1(scope of works and supply)hereto. the supplier shall procure, inspect,expedite and deliver these spare parts in the same manner as specified for the equipment in accordance with the terms of the contract.
8.3spare parts for operation
in addition to the stipulations in article 8.2 (equipment and spareparts)above, the supplier also agrees to supply spare parts required forthe operation and maintenance of the equipment for the period specified inappendix 7-1 (scope of works and supply)hereto. however, the buyer shallpay to the supplier the price of such spare parts, including other costsand expenses relating to the supply of the same, in addition to thecontract price for the equipment specified in article 12.1.1 hereof. suchprice and other terms and conditions for the supply of such spare partsshall be separately agreed in writing between the buyer and the supplierwhen the identity, specifications and quantities of the said spare partshave been determined between the buyer and the supplier.
8.4technical documents
the supplier agrees to prepare and submit to the buyer the technicaldocuments as per the list of the technical documents as specified inappendix 7-1 (scope of works and supply)hereto in accordance with theterms of the contract.
8.5technical services
the supplier agrees to provide the technical services at the contractplant as specified in appendix 7-5 (the supplier's engineer's technicalservices and working conditions)hereto in accordance with the terms ofthe contract.
8.6training
the supplier shall be responsible for conducting the training of thebuyer's operating and maintenance personnel as specified in appendix 7-1(scope of works and supply)hereto. the maximum number of man-months,places and periods of training and the responsibility for associated costsand expenses are as specified in appendix 7-1 (scope of works and supply)hereto. all other conditions including the program for and nature of thetraining shall be agreed between the buyer and the supplier.
article 9.supplier's manner of execution of works
9.1the supplier shall execute and complete the works with due careand diligence in accordance with the contract.
9.2the supplier shall comply with all laws in force in the countrywhere the works are carried out, whether national, provincial, municipalor otherwise, affecting the performance of the contract and binding uponthe supplier. the supplier shall indemnify and hold harmless the buyerfrom and against any and all liabilities, damages, claims, fines,penalties and expenses of whatever nature arising out of or resulting fromthe violation of such laws by the supplier or its personnel, including thesub-contractors and their personnel but without prejudice to article 10. 1(information and data)below.
article 10.buyer's responsibilities
上一页 [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] [15] [16] [17] [18] [19] [20] [21] [22] [23] [24] [25] [26] [27] [28] [29] [30] [31] [32] [33] [34] [35] [36] [37] [38] [39] [40] [41] [42] [43] [44] [45] [46] [47] [48] [49] [50] [51] [52] [53] [54] [55] [56] [57] [58] [59] [60] [61] [62] [63] [64] 下一页