导读:(b)pecial requirements andprecautionstobetakenfortransportation and storage of dangerous or inflammable equipment.22.2.4the date of "on board bill of lading" shall be deemed to be theactual delivery date of the respective equipment.22.2.5not later than _________ days before the readiness of eachshipment,(1)the supplier shall notify the buyer by cable/telex/ fax ofthe following information:(a)contract number(b)date of readiness of the equipment(c)
国际技术转让加设备进口合同,标签:技术开发合同,技术咨询合同,http://www.qz26.com
(b)pecial requirements andprecautionstobetakenfortransportation and storage of dangerous or inflammable equipment.
22.2.4the date of "on board bill of lading" shall be deemed to be theactual delivery date of the respective equipment.
22.2.5not later than _________ days before the readiness of eachshipment,(1)the supplier shall notify the buyer by cable/telex/ fax ofthe following information:(a)contract number(b)date of readiness of the equipment(c)total volume(d)total gross weight(e)total number of packages(f)shipping port(g)name, total gross weight and measurement of each package of theover-sized or over-weight equipment(h)name and imo number of the dangerous or inflammable equipment;(2) at the same time the supplier shall submit to the buyer thefollowing documents, each in six (6)copies:
(a)the detailed list of the shipment covering the contract number,item number, name of the equipment, specification, type, quantity, totalprice, the dimensions of each package (length x width x height), totalnumber of packages and name of shipping port
(b)overall packing sketch for each package of the over-sized orover-weight equipment
(c)description covering names, properties, specialprotectivemeasures and way of handling an accident for any dangerous or inflammableequipment
(d)description of the special precautions to be taken for theequipment with a special requirement for temperature, shock, etc. duringthe transportation
another copy of the said documents shall be submitted to the forwardagent of the buyer at the port of destination as a basis for arrangingtransportation, loading and unloading of the equipment by the buyer.
22.2.6each discrete part of the equipment shall be shipped as awhole. their special tools for erection and easily worn out parts shall bedispatched along with the equipment concerned. in case that any equipmentwhich are normally to be shipped on deck, the supplier shall beresponsible for their proper packing and take special protective measures.
22.2.7at the latest _________ days before the arrival of the carryingvessel at the shipping port, the buyer shall notify the supplier bycable/telex/fax of the name of the carrying vessel, expected date ofarrival, age and classification of the vessel, shipping agent and otherinformation necessary for the shipment (in case of substitution of thevessel or alteration of the shipping schedule, the buyer or its shippingagent shall duly inform the supplier to this effect).
22.2.8in the event of the supplier's failure in effecting shipmentupon the arrival of the buyer's vessel at the shipping port, thedemurrage, dead freight and other relevant charges thus incurred shall befor the supplier's account. such charges shall be calculated and settledin accordance with the relevant documents issued by the shipping company.
22.2.9provided the supplier has the equipment ready for shipment bythe expected date of arrival of the carrying vessel, and the buyer'svessel fails to arrive at the loading port within _________ days after theexpected date of shipment, the storage charges, insurance premium,interest and all the other additional expenses thus incurred by thesupplier within the said _________ days shall be for the supplier's account.the storage charges, insurance premium, interest and all the otheradditional expenses thus incurred by the supplier from the 31st day shallbe reimbursed by the buyer against the supplier's invoice accompanied withthe necessary accounting documents certifying the expenses incurred andthe reimbursement shall be made within _________ days after receipt of thesupplier's invoice by the buyer. in this case the supplier shall berelieved from the delivery time guarantees specified in article 26(delivery time guarantees)hereof.

上一页  [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] [15] [16] [17] [18] [19] [20] [21] [22] [23] [24] [25] [26] [27] [28] [29] [30] [31] [32] [33] [34] [35] [36] [37] [38] [39] [40] [41] [42] [43] [44] [45] [46] [47] [48] [49] [50] [51] [52] [53] [54] [55] [56] [57] [58] [59] [60] [61] [62] [63] [64]  下一页


Tag:技术合同技术开发合同,技术咨询合同合同范本 - 技术合同
【字号: 】 【打印】 【关闭
最新更新
推荐热门
联系我们 | 网站地图 | 财务资料 | 范文大全 | 求职简历 | 财会考试 | 成功励志
Copyright 二六求职资料网 All Right Reserved.
1 2 3 4 5 6 7 8 9 10