导读:21.3.5if any dispute or difference shall arise between the buyer andthe supplier in connection with or arising out of the disapproval by thebuyer of any document and/or any modification (s)thereto which cannot besettled between the parties within a reasonable period, then such disputeor difference may be referred to an expert for determination in accordancewith article 7.2 (reference to expert)hereof. if such dispute ordifference is referred to an expert,
国际技术转让加设备进口合同,标签:技术开发合同,技术咨询合同,http://www.qz26.com
21.3.5if any dispute or difference shall arise between the buyer andthe supplier in connection with or arising out of the disapproval by thebuyer of any document and/or any modification (s)thereto which cannot besettled between the parties within a reasonable period, then such disputeor difference may be referred to an expert for determination in accordancewith article 7.2 (reference to expert)hereof. if such dispute ordifference is referred to an expert, the buyer shall give instructions asto whether or not and, if so, how the works are to proceed. the suppliershall proceed with the works in accordance with the buyer's instructions,provided that if the expert upholds the supplier's dispute of thedisapproval and if no notice has been given by the buyer under article7.2.3 hereof, then the supplier shall be reimbursed by the buyer for anyadditional costs incurred by reason of such instructions and shall berelieved of such responsibility or liability in connection with thedispute and the execution of the instructions as the expert shall decideand the time for delivery shall be extended accordingly.
21.3.6the buyer's approval, either with or without modification(s),of the document furnished by the supplier shall not relieve the supplierof any responsibility or liability imposed upon it by any provisions ofthe contract except where and to the extent that the expert upholds thesupplier's dispute of the modification(s).
21.3.7the supplier shall not depart from any approved document unlessthe supplier has first submitted to the buyer an amended document andobtained the buyer's approval thereof pursuant to the provisions of thisarticle 21.3.
if the buyer requests any change in any already approved documentand/or in any document based thereon, the provisions of article 36 (changein works)hereof shall apply to such request.
21.4design liaison
21.4.1both parties shall participate in design liaison meetings asfollows:
21.4.2within _________ month after the effective date, _________shall at its own cost dispatch its engineer to _________ to participate inthe kick-off meeting for the period of _________. at the end of thekick-off meeting the buyer and the supplier shall sign the kick-offmeeting protocol.
21.4.3within _________ month after the effective date, _________shall at its own cost dispatch its engineer to _________ to participate inthe basic design review meeting for the period of _________. at the endof the basic design review meeting the buyer and the supplier shall signthe basic design review meeting protocol.
21.4.4within _________ month after the effective date, _________shall at its own cost dispatch its engineer to _________ to participate inthe detail design review meeting for the period of _________ . at the endof the detail design review meeting the buyer and the supplier shall signthe detail design review meeting protocol.
21.4.5during the period of the design work, the buyer may send hisengineer at its own expense to the supplier's relevant design offices orshops of the equipment manufacturers to understand the relevant technicaldata relating to the supplier's design or the equipment, provided that thesupplier's works are not hindered or the relevant equipment manufactureragrees to receive the buyer's engineer. the supplier shall assist for thebuyer to arrange entry visa and sojourn formalities.
21.4.6during the performance of the works, the supplier shall answerin time the questions put forward by the buyer in connection with thedesign and technical problems in the scope of the contract.

上一页  [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] [15] [16] [17] [18] [19] [20] [21] [22] [23] [24] [25] [26] [27] [28] [29] [30] [31] [32] [33] [34] [35] [36] [37] [38] [39] [40] [41] [42] [43] [44] [45] [46] [47] [48] [49] [50] [51] [52] [53] [54] [55] [56] [57] [58] [59] [60] [61] [62] [63] [64]  下一页


Tag:技术合同技术开发合同,技术咨询合同合同范本 - 技术合同
【字号: 】 【打印】 【关闭
最新更新
推荐热门
联系我们 | 网站地图 | 财务资料 | 范文大全 | 求职简历 | 财会考试 | 成功励志
Copyright 二六求职资料网 All Right Reserved.
1 2 3 4 5 6 7 8 9 10