目前本站已有 十几万 份求职资料啦!


国际技术转让加设备进口合同

10-15 21:07:03 来源:http://www.qz26.com 技术合同   阅读:8498
导读:2.the supplier shall appoint its skilled and qualified engineer (s)to instruct the buyer's engineers and to explain all the technicalproblems relating to the equipment.3.the supplier shall arrange for the buyer's engineers to be trainedat different sections in the above factories to enable them to understandthe technology and operation of the contract plant, and inspection, repairand maintenance of the equipment.4.the supplier shall provide for the
国际技术转让加设备进口合同,标签:技术开发合同,技术咨询合同,http://www.qz26.com
2.the supplier shall appoint its skilled and qualified engineer (s)to instruct the buyer's engineers and to explain all the technicalproblems relating to the equipment.
3.the supplier shall arrange for the buyer's engineers to be trainedat different sections in the above factories to enable them to understandthe technology and operation of the contract plant, and inspection, repairand maintenance of the equipment.
4.the supplier shall provide for the buyer's engineers, free ofcharge, test instruments, tools, technical documentation,drawings,reference data, working clothes, safety wear and other necessities as wellas suitable offices during their training period provided that the buyershall return them to the supplier when the training has finished.
5.the supplier shall submit the preliminary training program to thebuyer three months before the beginning of the training to enable thebuyer to begin to study. one month before the start of the training, thebuyer shall notify the supplier of the personal data of the buyer'sengineers including name, sex, date of birth, nationality, specialty,qualifications, working place and mastery of foreign language. the finaltraining program shall be fixed by both parties through consultations asprovided in the contract and the actual requirements of the buyer'sengineers after their arrival in _________ (country).
6.before the training starts, the supplier shall explain in detail to the buyer's engineers the operating regulations and other precautions for work.
7.the buyer's engineers shall observe the laws and regulations of the_________ (country)and rules and stipulations at the factories during theirstay in the _________ (country).
8.the supplier shallprovidethebuyer'sengineerswithaccommodation, meals and transport facilities at the buyer's expense.
in case of illness or accident of the buyer's engineers during theirstay in _________ (country), the supplier shall take necessary measures totake care of the buyer's personnel in the best possible way. the costshall be borne by the buyer.
9.the supplier shall assist the buyer's engineers with all theformalities necessary to obtain visas for entry and exit as well as duringtheir stay in _________ (country).
10.the supplier shall not charge a training fee to the buyer inaddition to the contract price, provided that all cost and expenses withrespect to the buyer's engineers' traveling and stay in _________(country)shall be borne by the buyer.
11.the supplier shall take necessary measures for the security of thebuyer's engineers during their stay in(country).
appendix 7-2technical specifications
appendix 7-3technical documents for approval by the buyer
appendix 7-4time schedule
appendix 7-5the supplier's engineer's technical services and working conditions
1.the supplier's engineer
in order to ensure the smooth construction of the contract plant bythe buyer, the supplier shall be responsible for sending skilled, healthyand competent engineers to the contract plant to carry out the technical.services during field construction, theprecommissioningandthecommissioning period.
the number of the supplier's engineer, the duration of their stay inthe buyer's country and their specialist skills are as indicated in table1 attached to this appendix.
the exact number of the supplier's engineer, the duration of theirstay in the buyer's country and the date of arrival and departure from thecontract plant shall be decided by both parties through negotiation basedon how the field construction is progressing.

上一页  [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] [15] [16] [17] [18] [19] [20] [21] [22] [23] [24] [25] [26] [27] [28] [29] [30] [31] [32] [33] [34] [35] [36] [37] [38] [39] [40] [41] [42] [43] [44] [45] [46] [47] [48] [49] [50] [51] [52] [53] [54] [55] [56] [57] [58] [59] [60] [61] [62] [63] [64]  下一页


Tag:技术合同技术开发合同,技术咨询合同合同范本 - 技术合同
【字号: 】 【打印】 【关闭
最新更新
推荐热门
联系我们 | 网站地图 | 财务资料 | 范文大全 | 求职简历 | 财会考试 | 成功励志
Copyright 二六求职资料网 All Right Reserved.
1 2 3 4 5 6 7 8 9 10